Scroll left
  • Loading the truck width:609;;height:400
  • Loading the trucks onto the barge at Cates Park width:265;;height:400
  • width:597;;height:400
  • Underway width:602;;height:400
  • The lull before the storm width:265;;height:400
  • Adding seawater to the steelhead smolts width:265;;height:400
  • Time for a break width:602;;height:400
  • Removing water and adding seawater width:265;;height:400
  • Onwards to the Lions Gate Bridge!!! width:602;;height:400
  • Land Ahoy! width:602;;height:400
  • Smolts away at Lighthouse Park width:602;;height:400
  • Smolts away at lighthouse park width:602;;height:400
  • Preparing the truck for the fish release at CAER docks in West Vancouver width:602;;height:400
  • Getting the hose ready width:602;;height:400
  • Releasing the steelhead smolts width:602;;height:400
  • Away they go width:602;;height:400
  • Into the sea, hopefully we will see them again in a couple of years as adult fish in the Seymour River width:602;;height:400
  • Closeer image of fish being released width:602;;height:400
Scroll right